Toggle navigation
Home
Unit
Head Office
UBP Asam-Asam
UBP Bali
UBP Banten 1 Suralaya
UBP Banten 2 Labuan
UBP Banten 3 Lontar
UBP Barito
UBP Barru
UBP Bengkulu
UBP Berau
UBP Bukittinggi
UBP Cilegon
UBP Grati
UBP Holtekamp
UBP Jabar 2 Pelabuhan Ratu
UBP Jambi
UBP Jateng 2 Adipala
UBP Jatigede
UBP Jeranjang
UBP Kamojang
UBP Kepulauan Riau
UBP Keramasan
UBP Labuhan Angin
UBP Mahakam
UBP Mrica
UBP Ombilin
UBP Pangkalan Susu
UBP Papua dan Maluku
UBP Priok
UBP Saguling
UBP Sanggau
UBP Semarang
UBP Singkawang
UBP Sintang
UBP Suralaya
UBP Tello
UBP Teluk Sirih
Unit Bisnis Pemeliharaan
Contact Us
FAQs
Login
Register
Register Vendor PO
Register Vendor Non PO
Overseas Registration
ENG
Bahasa Indonesia
English
ALL
KP
ASM
BLI
BSR
BLB
BLT
BTO
BRU
BKL
BEU
BKT
CLG
PGT
HTC
JPR
JMB
ADP
JTG
JRJ
KMJ
KRI
KRM
LBA
MHK
MRC
OMB
PNS
PMU
TGP
SGL
SGU
SMG
SKW
STG
SLA
TLO
TIR
UJH
PT PLN Indonesia Power
Head Office
TENDER ANNOUNCEMENT
Head Office
|
Posted Date :
21 Agustus 2024
RETUBING HIGH PRESSURE HEATER UNIT 2 DAN 3 PLTU ASAM ASAM
(closed)
Head Office
|
Posted Date :
15 Agustus 2024
Pengadaan Kapal Keruk Waduk Mrica PT PLN Indonesia Power UBP Mrica Tahun 2024
(closed)
Head Office
|
Posted Date :
30 Juli 2024
PELELANGAN TERBUKA REHABILITASI INTERNAL ELECTROSTATIC PRECIPITATOR UNIT 6 PT PLN INDONESIA POWER UBP SURALAYA
(closed)
Head Office
|
Posted Date :
31 Mei 2024
Invitation to Participate in the Selection of Contractor of Engineering, Procurement and Construction (EPC) Works for Mobile Power Plant Land Mounted Dual Firing with Capacity Range 1 to 50 MW per Unit in Multiple Location in Indonesia
(closed)
Head Office
|
Posted Date :
28 Mei 2024
PENGADAAN MATERIAL DAN JASA PEMELIHARAAN PERIODIK SEMI OVERHAUL (SO) DAN MAJOR OVERHAUL (MO) UNIT MESIN MAN TIPE D 2840 LE 201, D 2842 LE 201 DAN D 2866 LE/LE 203 UBP MAHAKAM
(closed)
Head Office
|
Posted Date :
20 Mei 2024
PENGADAAN MATERIAL DAN JASA PEMELIHARAAN PERIODIK SEMI OVERHAUL (SO) DAN MAJOR OVERHAUL (MO) UNIT MESIN MAN TIPE D 2840 LE 201, D 2842 LE 201 DAN D 2866 LE/LE 203 UBP MAHAKAM
(closed)
Head Office
|
Posted Date :
20 Mei 2024
PENGADAAN MATERIAL DAN JASA PEMELIHARAAN PERIODIK MAJOR OVERHAUL (MO) 5 (LIMA) UNIT MESIN CUMMINS QSK23-G3 PLTD MUARA BENGKAL UP PLTD-MG BONTANG
(closed)
Head Office
|
Posted Date :
03 April 2024
PENGADAAN SPAREPARTS PEMELIHARAAN PERIODIK MAYOR OVERHOUL MESIN MAK 8M 453 C S/N. 27272 PLTD BAAMANG ULPLTD TAMBUN BUNGAI DAN MAK 8M 453 C S/N. 27189 PLTD KUMAI ULPLTD TAMBUN BUNGAI TAHUN 2024
(closed)
Head Office
|
Posted Date :
06 Maret 2024
Migrasi Unit Bisnis Pembangkitan Suralaya Unit 3 Dari 500 kV Ke 150 kV
(closed)
Head Office
|
Posted Date :
04 Maret 2024
PENGADAAN SPARE PART FAST MOVING & CRITICAL PARTS PLTG TELLO 6BP
(closed)
View All Announcement >>
Whistle Blowing System
Whistle Blowing System
FORMS & GUIDELINES
Form
Vendor Management
Code of Conduct
Registration Guidelines
Manual Guide I-Track
Manual Guide e-Procurement
Anti Bribery & Gratuity Policy
VISITOR COUNTER
Flag Counter
© 2024 PT PLN Indonesia Power
Trust Us for Power Excellence